The School Construction Authority retained Lilker Associates’ and their Technology Solutions Group (TSG) to be a part of their team for the design and implementation of a brand new, out of the Ground 110,000 sq. ft., 5 floor educational facility. Lilker and TSG’s tasks consisted of designing the MEP FP systems and technology cabling infrastructure for Public School 93M. The technology cabling infrastructure design consists of the cabling required to support voice, data, CATV, and public address systems.
